BERDO: emissions limits that step down to zero
Boston's Building Emissions Reduction and Disclosure Ordinance sets an emissions limit for every large building, tightening every five years until it reaches net zero in 2050. Emissions above the limit are settled with alternative compliance payments of $234 per metric ton.
- Reporting
- 20,000 sq ft+or 15 or more residential units
- Standards now
- 35,000 sq ft+or 35+ units; smaller covered buildings start with 2030 emissions
- Measured by
- kgCO2e / sq ftannual emissions intensity against Table 1 limits
- Alternative payment
- $234 / tonof CO2e over the limit, reviewed every five years
How the standards work
Table 1 of the ordinance assigns each building use an emissions limit for each five-year period. Multifamily housing starts at 4.1 kgCO2e per square foot for 2025 to 2029, then drops to 2.4, 1.8, 1.1 and 0.6 before reaching zero in 2050. Office starts at 5.3 and follows the same path down.
Emissions are calculated from reported energy. For electricity, the city uses the lower of the actual annual grid factor and a projected factor; the projection for 2025 is 249 kg per MWh, falling to 150 by 2050. Natural gas counts at a fixed 53.11 kg per MMBtu. As the grid gets cleaner, all-electric buildings gain room under the limit while gas-heated buildings don't.
Buildings from 20,000 to 35,000 square feet, and residential buildings with 15 to 34 units, report now but don't face emissions standards until 2031, when they're measured on 2030 emissions.
Flexibility measures
Blended standards
Mixed-use buildings can use a floor-area-weighted limit when a use takes up at least 10% of floor area or energy. The blend must be third-party verified.
Building portfolios
Owners can group buildings and comply on the portfolio's combined emissions, letting an efficient building offset a harder one.
Individual compliance schedules
A building-specific schedule measured from the building's own baseline year. It must decline at least linearly, cut emissions 50% by 2030 and reach zero by 2050.
Hardship compliance plans
Alternative targets or timelines, applied for through the Review Board, for hardships such as historic designation, affordable housing refinancing timelines, long-term energy contracts or financial hardship.
Energy data must be third-party verified by a qualified energy professional in verification years, and the verifier cannot be the same person who prepared the report.
What a shortfall costs
Emissions over the limit are covered with alternative compliance payments at an initial $234 per metric ton of CO2e. The Review Board revisits that price at least every five years and can change it through regulation.
Because the limits fall every five years, the exposure for an unchanged building grows each period. A gas-heated multifamily building that is a few tons over in 2025 can be well over by 2030, when its limit drops by more than 40%.
Estimate your 2025 to 2029 payment from floor area, use and annual energy.
Open the BERDO estimatorHow Probitas helps
A gap assessment models each building against every Table 1 period, not just the current one, and tests whether a blended standard or a portfolio would lower the bill. The retrofit ROI analysis times electrification and efficiency projects against the step-downs. Our benchmarking support prepares the annual report and coordinates third-party verification. Blended-standard requests, building portfolio, individual compliance schedule and hardship applications are handled through our compliance filings service.
Other standards we cover
Portfolios rarely sit under one law. We map every building to every standard that applies to it.
Sources. Summary as of October 2026. Rules change; confirm current requirements for your building before acting. This page is general information, not legal advice.
- City of Boston Code § 7-2.2, Building Emissions Reduction and Disclosure Ordinance, Table 1.
- BERDO Regulations (2026).
- BERDO Policies and Procedures, version 5 (adopted September 14, 2026), including Appendix B projected grid emissions factors.