Energize Denver: one target, three ways to reach it
Denver requires buildings of 25,000 square feet and up to reach a site energy use intensity target for their property type. Owners can choose among three timelines. Extensions move the deadline but not the target, and each timeline carries a different penalty rate.
- Covered
- 25,000 sq ft+for performance targets; smaller buildings have separate requirements
- Measured by
- Site EUIweather-normalized, against a final target for the property type
- Penalty
- $0.15 to $0.35per kBtu of required reduction not achieved, per target year
- Benchmarking due
- June 1every year, through ENERGY STAR Portfolio Manager
How the targets work
Table 1 of the Rules and Regulations sets a final site EUI target for each property type. Multifamily housing is 44.2 kBtu per square foot; office is 48.3. A handful of types, including museums, arenas and transportation terminals, use a target of 30% below their own baseline instead.
Interim targets are a straight line from the building's baseline EUI down to the final target. No building can be required to cut more than 42% of its weather-normalized site EUI from baseline. Mixed-use buildings get a target weighted by floor area. Owners can also apply for target adjustments in specific situations, which is worth checking before you plan around the Table 1 number.
Choosing a timeline
Standard timeline
Target years in 2025, 2027 and 2030. Penalty of up to $0.15 per kBtu not reduced at each target year.
2025 timeline extension
Two target years, 2028 and 2032. The final target is the same; the penalty rate rises to up to $0.23 per kBtu.
Individual timeline extension
A single target year set in the extension notice. Capital-planning extensions can run through 2036. The penalty rate is up to $0.35 per kBtu.
The trade is time for exposure. An extension buys years to fund the work, but each kBtu still unreduced costs more when the target year arrives. Missing the deadline to file for an extension adds up to $0.10 per kBtu to the rate.
Penalties to plan around
- Missing the final target. If a building misses its target in the final target year, the penalty can be assessed again every year after that.
- No benchmarking submission in a target year can cost up to $5.00 per square foot. Routine annual benchmarking violations are $2,000 each.
- Maintenance. After reaching the final target, a building that drifts back up can face penalties of up to $0.05 per kBtu within 5% of target, and up to $0.15 per kBtu beyond that.
Pick your property type and timeline, enter your current EUI, and see the penalty at the final target year.
Open the Denver estimatorHow Probitas helps
We use the gap assessment to compare the three timelines side by side for each building: what each one costs if you do nothing, and what it costs if your capital plan slips a year. The retrofit ROI analysis then sizes the projects to the target you choose. Benchmarking support handles the June 1 filing, which is also how Denver measures compliance. Timeline extension and target adjustment applications, which have their own deadlines, are part of our compliance filings service.
Other standards we cover
Portfolios rarely sit under one law. We map every building to every standard that applies to it.
Sources. Summary as of October 2026. Rules change; confirm current requirements for your building before acting. This page is general information, not legal advice.
- Energize Denver Rules and Regulations (August 27, 2026), Sections 3, 4 and 7.6, and Table 1.
- Energize Denver Technical Guidance for Buildings 25,000 Square Feet or Larger, version 4.0 (September 1, 2026).